Magtech .32 S&W Long Ammunition 50 Rounds LWC 98 Grains 32SWLB

Magtech
754908104017
32SWLB
AMM-3090-50
$23.54
QTY:
| Tell a Friend
Can we ship this to you?
Typically ships within 1 to 2 business days.
  • Non-returnable item. We will not accept any returns on this item.
Magtech ammunition prides themselves on being a world leader in engineering some of the best ammunition available in the market today. As one of the oldest manufacturer's in the world, they have produced billions of rounds of ammunition in a variety of calibers, weights and styles. Magtech lives by these three standards; The innovation is clear, The workmanship is evident, The quality speaks for itself.

50 Round Box

Features and Specifications:
Manufacturer Number: 32SWLB
Caliber: .32 Smith & Wesson Long (.32 S&W Long)
Bullet Type: Lead Wad Cutter (LWC)
Bullet Weight: 98 Grains
Rounds: 50 Rounds per Box
Muzzle Velocity: 682 FPS
Muzzle Energy: 101 Ft/lbs
Bullet Diameter:0.314"
Casing: Brass
Bullet Ballistic Coefficient: 0.03
Primer Style: Boxer

Features:
* Accurate
* Positive Functioning
* Quick Expansion
* Energy Transfer
Usage: Self Defense, Range 

Item#: AMM-3090-50